COMPLETED PROJECTS
Pietermaritzburg Girls High School
300kw Grid Tied PV solution with generator integration. This system is connected to the grid as well as being connected to 1 x 550kva generator with integration meaning the school has no down time during load shedding.
Crusaders Logistics
100kw Hybrid Solar solution paired with 1 x 80kwh Lithium Ion battery. This is a solar solution sized for savings on electricity as well as a battery backup supply for load shedding requirements. This 24–hour business has no down time.
Tradecore Steel
100kw Grid Tied PV solution ensures that this facility maximises the use of solar production during the daytime and relies very little on consuming power from the municipality.
BRACKEN TIMBERS
THE ARCH
BRAHMAN HILLS
CUTTING EDGE TECHNOLOGIES
MTUNZINI SPAR
TRANSPEC